English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 8557/14866 (58%)
造訪人次 : 1416798      線上人數 : 1239
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋
    主頁登入上傳說明關於CHUR管理 到手機版
    其他教師著作 [6/15]
    大專學生研究計畫 [3/14]
    專利 [4/14]
    專書 [0/1]
    專題研究計畫 [22/54]
    期刊論文 [81/254]

    類別統計

    近3年內發表的文件:0(0.00%)
    含全文筆數:182(30.90%)

    文件下載次數統計
    下載大於0次:182(100.00%)
    下載大於100次:182(100.00%)
    檔案下載總次數:32998(52.35%)

    最後更新時間: 2024-12-01 07:11


    上傳排行

    資料載入中.....

    下載排行

    資料載入中.....

    RSS Feed RSS Feed

    跳至: [中文]   [數字0-9]   [ A B C D E F G H I J K L M N O P Q R S T U V W X Y Z ]
    請輸入前幾個字:   

    顯示項目1-25 / 589. (共24頁)
    1 2 3 4 5 6 7 8 9 10 > >>
    每頁顯示[10|25|50]項目

    日期題名作者
    2005 22nd Integration of CMIS and MS Project in Construction Schedule Control 蕭炎泉; Shiau, Yan-Chyuan
    2011 Adsorption of Organic Compounds on Carbon Nanotubes/Carbon Fabric Composites in Liquid Phase 楊錫麒; Yang, Hsi-Chi
    2006 Analysis of Construction Inventive Patents Based on TRIZ 鄭紹材; Cheng, Shao-Tsai
    2006 Analysis of Construction Inventive Patents Based on TRIZ 余文德; Yu, Wen-der
    2008 Analysis of delay causes for pipeline projects in sewage system: Taiwan cases 楊智斌; Yang, Jyh-Bin
    2011 Analysis on Railway Temporary Tracks–Using Temporary Tracks at Fengyuan Section as an Example鐵路高架化前臨時軌工程施工實務探討-以豐原段為例 蕭炎泉; Shiau, Yan-Chyuan
    2009 Analyzing Schedule Delays through Computerized ICBF Method 楊智斌; Yang, Jyh-Bin
    2007 Analyzing Tender Selection Using a Geometric Graph Analysis (GGA) Approach 余文德; Yu, Wen-der
    2011 Application of a Fuzzy Inference System to Patent Strategy Analysis of Fall Protection Technology 余文德; Yu, Wen-der
    2011 Application of a Fuzzy Inference System to Patent Strategy Analysis of Fall Protection Technology 鄭紹材; Cheng, Shao-Tsai
    2011 THE APPLICATION OF CONCURRENT ENGINEERING IN THE INSTALLATION OF FOAM FIRE EXTINGUISHING PIPING SYSTEM 楊錫麒; Yang, Hsi-Chi
    2007 The application of expert system in sanitary sewer construction method selection sytem 蕭炎泉; Shiau, Yan-Chyuan
    2009 The Application of Innovative Technology for Improvement of Heat Insulation Performance on the Steel Deck Roofs 鄭紹材; Cheng, Shao-Tsai
    2003 Applying the Theory of Constraints to Construction Scheduling 楊智斌; Yang, Jyh-Bin
    2011 An Automated Construction Innovation Model to Meet Future Construction Challenges 鄭紹材; Cheng, Shao-Tsai
    2011 An Automated Construction Innovation Model to Meet Future Construction Challenges 余文德; Yu, Wen-der
    2006 Benchmarking Technological Competitiveness of Precast Construction through Patent Map Analysis 鄭紹材; Cheng, Shao-Tsai
    2006 Benchmarking Technological Competitiveness of Precast Construction through Patent Map Analysis 余文德; Yu, Wen-der
    2007 The body of knowledge of procurement project management for construction projects 楊智斌; Yang, Jyh-Bin
    2008 BOT 模式執行過程時程落後原因分析 楊智斌; Yang, Jyh-Bin
    2005 BOT與統包專案模式財務模型之分析—以某大學人宿舍為例 余文德; Yu, Wen-der
    2008 BSL-3 實驗室規劃設計及現場施工管理之研究 蕭炎泉; Shiau, Yan-Chyuan
    2012 Combine BIM to Develop Intelligent Building Fire Prevention Monitoring System 蕭炎泉; Shiau, Yan-Chyuan
    2011 Comparative Study of the Contaminant Removal Efficiencies from Municipal Wastewater by an Aerobic Biofilm System Using Natural Gravels and Recycling Materials as the Contact Media 鄭紹材; Cheng, Shao-Tsai
    2005 Comparison of CPM and CCS Tools to Construction Project 楊智斌; Yang, Jyh-Bin

    顯示項目1-25 / 589. (共24頁)
    1 2 3 4 5 6 7 8 9 10 > >>
    每頁顯示[10|25|50]項目

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 回饋