Chung-Hua University Repository:Item 987654321/36207
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 8557/14866 (58%)
Visitors : 2427945      Online Users : 2454
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://chur.chu.edu.tw/handle/987654321/36207


    Title: A three-stage integrated approach for assembly sequence planning using neural networks
    Authors: 鄧維兆
    Deng, Wei-Jaw
    Contributors: 休閒遊憩規劃與管理學系
    Leisure and Recreation Management
    Keywords: Assembly sequence planning;Above Graph;Assembly precedence diagrams;Back-propagation neural network;Assembly sequence optimization
    Date: 2008
    Issue Date: 2014-06-27 11:38:25 (UTC+8)
    Abstract: This study develops a three-stage integrated approach with some heuristic working rules to assist the planner in generating a best and
    most effective assembly sequence. In the first stage, Above Graph and transforming rule are used to create a correct exp
    Appears in Collections:[Department of Leisure and Recreation Management] Journal Articles

    Files in This Item:

    File Description SizeFormat
    p_i305_0054.pdf29KbAdobe PDF160View/Open


    All items in CHUR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback