English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 8557/14866 (58%)
造訪人次 : 1416402      線上人數 : 867
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋
    主頁登入上傳說明關於CHUR管理 到手機版


    請使用永久網址來引用或連結此文件: http://chur.chu.edu.tw/handle/987654321/35499


    題名: A capacity available-to-promise model for Drum-Buffer-Rope systems
    作者: 吳鴻輝
    Wu, Horng-Huei
    貢獻者: 工業管理學系
    Industrial Management
    關鍵詞: Available-to-promise (ATP);Capable-to-promise (CTP);Capacity available-to-promise (CATP);Drum-buffer-rope (DBR);Due-date assignment;Order promising
    日期: 2008
    上傳時間: 2014-06-27 10:40:24 (UTC+8)
    摘要: The capacity available-to-promise (CATP) concept, which is designed to enhance
    the available-to-promise (ATP) feature in MRPII for changing production
    strategy from make-to-stock (MTS) to make-to-order (MTO), was developed
    recently. In contrast to an ATP,
    顯示於類別:[工業管理學系] 期刊論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    p_m515_0100.pdf27KbAdobe PDF259檢視/開啟


    在CHUR中所有的資料項目都受到原著作權保護.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 回饋