Chung-Hua University Repository:Item 987654321/35473
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 8557/14866 (58%)
Visitors : 1402828      Online Users : 2640
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://chur.chu.edu.tw/handle/987654321/35473


    Title: A DBR scheduling method for manufacturing environments with bottleneck re-entrant flows
    Authors: 吳鴻輝
    Wu, Horng-Huei
    Contributors: 工業管理學系
    Industrial Management
    Keywords: TOC (theory of constraints);DBR (drum-buffer-rope);Bottleneck scheduling;Drum development method;Bottleneck re-entrant flows
    Date: 2006
    Issue Date: 2014-06-27 10:39:45 (UTC+8)
    Abstract: Implementing the drum-buffer-rope (DBR) management system effectively
    increases throughput, lowers work in process (WIP), shortens cycle time, and
    improves on-time delivery performance. However, implementing DBR is difficult
    and complex in manufacturing e
    Appears in Collections:[Industrial Management] Journal Articles

    Files in This Item:

    File Description SizeFormat
    p_m515_0097.pdf27KbAdobe PDF169View/Open


    All items in CHUR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback