Chung-Hua University Repository:Item 987654321/30513
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 8557/14866 (58%)
造访人次 : 2388187      在线人数 : 2574
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻
    主页登入上传说明关于CHUR管理 到手机版


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: http://chur.chu.edu.tw/handle/987654321/30513


    题名: Causes of delay in the planning and design phases for construction projects
    作者: 楊智斌
    Yang, Jyh-Bin
    贡献者: 營建管理學系
    Construction Management
    关键词: Time;Claims;Delay Causes;Planning and Design Phase;Questionnaire Survey
    日期: 2010
    上传时间: 2014-06-27 01:02:19 (UTC+8)
    摘要: Problems of delay occur in all phases of construction projects. While most previous studies have focused on finding causes or overcoming delays in the construction phase, few studies have analyzed delay problems in the planning and design phases. The main
    显示于类别:[營建管理學系] 期刊論文

    文件中的档案:

    档案 描述 大小格式浏览次数
    p_a308_0192.pdf26KbAdobe PDF302检视/开启


    在CHUR中所有的数据项都受到原著作权保护.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 回馈