Chung-Hua University Repository:Item 987654321/30441
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 8557/14866 (58%)
Visitors : 1984738      Online Users : 1819
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://chur.chu.edu.tw/handle/987654321/30441


    Title: Renovation and Maintenance of Theater Dimmer Systems: Case Study on the Experimental Theater of the National Drama Theater
    Authors: 蕭炎泉
    Shiau, Yan-Chyuan
    Contributors: 營建管理學系
    Construction Management
    Keywords: 舞台;燈光控制;實驗劇場;調光機櫃
    Stage;Dimmer System;Experimental Theater;Thyristor Dimmer Module
    Date: 2012
    Issue Date: 2014-06-27 01:00:28 (UTC+8)
    Abstract: 台灣表演場館多具相當的歷史,經過長時間的演出,建築結構及設備系統已呈相當程度的老化,對於劇場舞台、燈光、音響效果已造成重大影響。本研究以台北國家戲劇院實驗劇場為案例,探討劇場燈光調光系統之更新注意要項,讓管理單位能有效掌握燈光調光系統設備之更新要點;並以設備之維護為對象進行匯整,供相關從業人員參考,以確保燈光調光系統之使用功能。
    Many performing venues in Taiwan are historical. After long-time use, both the structure and equipment system of these venues have aged, thus causing critical impact on the stage, lighting, and sound effects. Based on the case of the Experimental Theater
    Appears in Collections:[Department of Construction Management] Journal Articles

    Files in This Item:

    File Description SizeFormat
    p_a308_0159.pdf27KbAdobe PDF157View/Open


    All items in CHUR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback