Chung-Hua University Repository:Item 987654321/30099
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 8557/14866 (58%)
Visitors : 2582941      Online Users : 4429
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://chur.chu.edu.tw/handle/987654321/30099


    Title: An Integrated Proactive Knowledge Management Model for Enhancing Engineering Services
    Authors: 余文德
    Yu, Wen-der
    Contributors: 營建管理學系
    Construction Management
    Keywords: Engineering consulting;Knowledge management;Proactive problem-solving;Business intelligence
    Date: 2012
    Issue Date: 2014-06-27 00:49:53 (UTC+8)
    Abstract: More and more construction organizations have adopted Knowledge Management (KM) to enhance their engineering services. However, most of the traditional KM methods suffer from their “reactive mode” of problem solving. To cope with this problem, a newly dev
    Appears in Collections:[Department of Construction Management] Journal Articles

    Files in This Item:

    File Description SizeFormat
    p_a308_0044.pdf31KbAdobe PDF164View/Open


    All items in CHUR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback