Chung-Hua University Repository:Item 987654321/28456
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 8557/14866 (58%)
Visitors : 1417270      Online Users : 1684
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    CHUR > College of Management > Industrial Management > Seminar Papers >  Item 987654321/28456


    Please use this identifier to cite or link to this item: http://chur.chu.edu.tw/handle/987654321/28456


    Title: Throughput impact of the strategic stabilizing capacity constraint resource by prolonging planning periods
    Authors: 吳鴻輝
    Wu, Horng-Huei
    Contributors: 工業管理學系
    Industrial Management
    Keywords: Theory of Constraints (TOC);Product Mix Determination;CCR Wandering;Strategic stabilizing CCR .
    Date: 2005
    Issue Date: 2014-06-26 23:59:36 (UTC+8)
    Abstract: The issue of capacity constraint resources (CCR) or bottlenecks wandering in product mix decision by applying TOC management philosophy has been mentioned and demonstrated in several papers. In this paper, the effect for prolonging the planning period (PP
    Appears in Collections:[Industrial Management] Seminar Papers

    Files in This Item:

    File Description SizeFormat
    s_m515_0240.pdf27KbAdobe PDF39View/Open


    All items in CHUR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback