Chung-Hua University Repository:Item 987654321/26575
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 8557/14866 (58%)
Visitors : 1417236      Online Users : 1658
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://chur.chu.edu.tw/handle/987654321/26575


    Title: Analyzing Schedule Delays through Computerized ICBF Method
    Authors: 楊智斌
    Yang, Jyh-Bin
    Contributors: 營建管理學系
    Construction Management
    Keywords: Schedule Delay;Delay Analysis;Construction Dispute;Information Technique
    Date: 2009
    Issue Date: 2014-06-26 20:39:47 (UTC+8)
    Abstract: Schedule delays are common disputes in construction projects. It is required to develop a usable tool for resolving delay problems. Previous study had proposed an innovative approach for analyzing schedule delays, namely the Isolated Collapsed But-For (IC
    Appears in Collections:[Department of Construction Management] Seminar Papers

    Files in This Item:

    File Description SizeFormat
    s_a308_0503.pdf25KbAdobe PDF329View/Open


    All items in CHUR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback