Chung-Hua University Repository:Item 987654321/26469
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 8557/14866 (58%)
Visitors : 3209366      Online Users : 1991
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://chur.chu.edu.tw/handle/987654321/26469


    Title: 整合MS Project於營建工地材料管理系統之研究
    Authors: 蕭炎泉
    Shiau, Yan-Chyuan
    Contributors: 營建管理學系
    Construction Management
    Keywords: 工地物料管理;MS Project;Revit Architecture 2009
    Site Material Management;MS Project;Revit Architecture2009
    Date: 2010
    Issue Date: 2014-06-26 20:36:18 (UTC+8)
    Abstract: 工程專案進行當中建築材料需求往往以進度為導向,因忽略資源配合因素常造成資金調度或材料供應不及問題,在營建工地中如能使用工地物料管理系統來改善原有的管理模式,讓建築材料的種類、數量、庫存數量等資料可正確取得並且快速的整合到管理系統,以便工程人員能夠隨時掌握工地裡建築材料正確的資訊,將能達到有效的管理並提升工地施工的效率。
    本研究在『整合性工地物料管理系統』之原有架構上,結合Revit Architecture 2009軟體,並整合MS Project 之完整專案進度管理功能,將原Project 中各Acti
    During the process of a constructing project, the demand for construction material always depends upon the schedule planning. The neglect of resources factor often leads to problems of capital dispatching and late material supply. In a construction site,
    Appears in Collections:[Department of Construction Management] Seminar Papers

    Files in This Item:

    File Description SizeFormat
    s_a308_0413.pdf35KbAdobe PDF142View/Open


    All items in CHUR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback