Chung-Hua University Repository:Item 987654321/25931
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 8557/14866 (58%)
Visitors : 2012566      Online Users : 1183
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://chur.chu.edu.tw/handle/987654321/25931


    Title: 空軍軍事工程爭議預防對策之探討
    Authors: 楊錫麒
    Yang, Hsi-Chi
    Contributors: 營建管理學系
    Construction Management
    Keywords: 工程爭議;爭議預防;德爾菲法
    Construction Disputes;Dispute Handling;Dispute Prevention
    Date: 2012
    Issue Date: 2014-06-26 20:14:58 (UTC+8)
    Abstract: 空軍軍事工程過程中衍生之糾紛與爭議,將導致工程人員需消耗大量的精力及時間,並藉由行政院公共工程委員會及律師等協助下,與承包廠商進行協調、申訴、調解、仲裁及訴訟,此種情況,不僅延誤工期與預算支用,更嚴重影響軍事營繕工程之成本規劃與管理效益。
    本研究乃構思藉由相關軍事營繕工程法規及一般公共工程營建法規之法令整理、案例及專業人員等方面做調查,再經由研究與分析案例缺失等要因後,進而提出較為符合管理科學的改善方法,以期盼研究成果能作為軍事工程爭議之處理及預防參考,進而提昇軍事工程之執行績效與品質。
    Controversies and disputes derived during the Air Force military project construction process will lead to the engineering staff to consume a lot of energy and time. The Air Force are often required to make coordination, complaints, mediation, arbitration
    Appears in Collections:[Department of Construction Management] Seminar Papers

    Files in This Item:

    File Description SizeFormat
    s_a308_0185.pdf35KbAdobe PDF150View/Open


    All items in CHUR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback