Chung-Hua University Repository:Item 987654321/35769
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 8557/14866 (58%)
Visitors : 2374869      Online Users : 1355
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://chur.chu.edu.tw/handle/987654321/35769


    Title: Capacity planning with sequential two-level of time constraints in the back-end of wafer fabrication
    Authors: 杜瑩美
    Tu, Ying Mei
    Contributors: 工業管理學系
    Industrial Management
    Keywords: capacity planning;sequential time constraints;queuing networks;wafer fabrications
    Date: 2009
    Issue Date: 2014-06-27 10:49:07 (UTC+8)
    Abstract: Time constraint is a queue-time boundary which is set between particular sequential operations to ensure final product yield. These time boundaries, named “sequential time constraints,” can be found in a series of operations in the back-end of wafer fabri
    Appears in Collections:[Industrial Management] Journal Articles

    Files in This Item:

    File Description SizeFormat
    p_m515_0193.pdf27KbAdobe PDF238View/Open


    All items in CHUR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback